Preschool Index
Daycare centerLicence active Verified

Park Nursery Schools

Daycare center in Norwich, CT. 283 Broadway, Norwich, CT 06360

4.8 (4 on Google)Read parent reviews
Call (860) 889-6447Visit website
AgesPreschool
Hours8:30 am to 1:30 pm
Tuition fromNot listed
Licensed capacity21 children
Violations, last 3 years13
On the register since1968

About the program

Park Nursery Schools is a licensed daycare center in Norwich, Connecticut, on the state register since 1968. It is licensed for 21 children and serves preschool ages.

Park Nursery School is a Norwich, Connecticut-based preschool program serving children ages three to five.

The program follows a play-based approach.

Play-based

Tuition and capacity

Tuition: not listed. Park Nursery Schools does not publish a fee schedule on its website. Programs in the area that publish full-time tuition have a median starting price of $1,203 a month.

Licensing and safety

Open the state record →
Licence typeChild Care Center · DCCC.12202
Licence statusActive since 1968
Licensed capacity21 children
Inspections on file5
Source: Connecticut Office of Early Childhood. Last synced September 18, 2026.
Violations, last 3 years13Area median for centers: 18
Inspections on file5
All violations on file23Most recent January 2026

Most violations are record-keeping, training or maintenance items, and nearly every program has some. Read what each one was and how fast it was fixed. Connecticut records each regulation cited at an inspection with the date it was closed. The state does not assign a risk level. The text shown is the regulation the program was cited under.

Cited January 22, 2026

Daily Attendance Records: Children/Staff [19a-79-3a(d)(1)]

Regulation: Daily attendance records for both children and program staff, recorded daily at the time of arrival and departure and kept on file at the facility for at least one year, showing the specific times of arrival and departure.

Cited January 22, 2026

Postings [19a-79-3a(d)6)(C), (e)(1-6), 7a(e)(17), 10(g)(8)]

Regulation: The operator shall post the following items in a conspicuous place, accessible to the public: the license, the OEC complaint procedure, menus, No Smoking signs, the plan for administrative oversight, the radon test, the OEC Inspection report (posted or available), the safe sleep policy and the OEC Developmental Milestones document.

Cited January 22, 2026

Professional development [19a-79-4a(a)(2), (h)(1-2)]

Regulation: Documentation of professional development for each program staff who cares for the children, including new employee orientation and annual training for current program staff on the child care center or group child care home policies, plans and procedures. Program staff, including the director, shall complete health and safety training no later than three months after the date of hire. Written verification of ongoing training that is at least one percent of the total annual hours worked. As of A

Cited January 22, 2026

Consultants [19a-79-4a(i)(1-2)(H), (F)]

Regulation: An education consultant shall be available to the operator and program staff for advice and support regarding the educational content and practice of the program. A person needs to apply for approval to be an education consultant. Program staff shall not serve as education consultants for programs in which they provide direct care or direct program supervision in a non-consultative role; or in a program with the same operator as a program in which they provide direct care or direct program super

Cited January 22, 2026

Toileting [19a-79-7a(d)(10)(A-H)]

Regulation: Where toilets and sinks are shared by children and adults, a written policy shall be developed and implemented that requires supervision of children when using the shared toilet room. Programs shall provide changing and sanitary facilities appropriate to meet the individual needs of children who are enrolled at the facility who need assistance with toileting or who are not independent with toileting. Facilities using potty chairs in addition to the required toilets shall ensure that they are of

Show all 23 violations on file
Cited January 22, 2026

Policies- complete, implemented [19a-79-3a(d)(2)-(7)]

Regulation: The operator shall implement and annually review specific written policies, plans and procedures that include, but not necessarily be limited to discipline, when a child is not picked up as planned, multi-hazard and medical emergencies, supervision of children, general operating policies, administrative oversight and personnel policies. The operator shall notify the parent(s), staff and the Office of Early Childhood within five (5) days of changes in these policies, plans and procedures.

Cited October 15, 2024

Logs/Visits Documented [19a-79-4a(h)(2)(G)]

Regulation: A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that is kept on file at the facility for two years.

Cited October 15, 2024

License Premise Clean/Good Repair/Safe [19a-79-6a and/or 19a-79-7a]

Regulation: The building, equipment and services shall be maintained in a good state of repair. A maintenance program shall be established that ensures that the interior, exterior and grounds of the building are maintained, kept clean and orderly, free from accumulations of refuse, dampness, stagnant water, dilapidated structures and other health and safety hazards.

Cited October 15, 2024

Outdoor Play Area Protected/Fenced [19a-79-7a(h)(7)]

Regulation: The outdoor play area shall be protected from traffic, bodies of water, gullies and other hazards by barriers in a manner safe for children.

Cited January 2, 2024

Consultant Agreements/Contracts [19a-79-4a(h)(1) and/or 19a-79-4a(h)(2)]

Regulation: A written plan for consultation services shall be developed, signed annually by the consultant and implemented. These services shall include an early childhood educational consultant, a health consultant, a dentist or dental hygienist consultant, a social service consultant, and a registered dietitian consultant for those programs that serve meals. Consultative services shall include annual review of written policies, plans and procedures, annual review of education programs, availability by tel

Cited January 2, 2024

Logs/Visits Documented [19a-79-4a(h)(2)(G)]

Regulation: A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that is kept on file at the facility for two years.

Cited January 2, 2024

License Premise Clean/Good Repair/Safe [19a-79-6a and/or 19a-79-7a]

Regulation: The building, equipment and services shall be maintained in a good state of repair. A maintenance program shall be established that ensures that the interior, exterior and grounds of the building are maintained, kept clean and orderly, free from accumulations of refuse, dampness, stagnant water, dilapidated structures and other health and safety hazards.

Cited January 2, 2024

Emergency Plans [19a-79-3a(e)(6)]

Regulation: The operator shall post emergency plans in a conspicuous place, accessible to the public.

Cited December 15, 2022

Current Fire Marshal Certificate [19a-79-3a(e)(2)]

Regulation: The operator shall post the current fire marshal certificate in a conspicuous place, accessible to the public.

Cited December 15, 2022

Logs/Visits Documented [19a-79-4a(h)(2)(G)]

Regulation: A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that is kept on file at the facility for two years.

Cited March 23, 2022

Daily Attendance Records: Children/Staff [19a-79-3a(d)(1)]

Regulation: The operator shall implement and annually review specific written policies, plans and procedures that include daily attendance records for both children and staff showing the specific times of arrival and departure. The operator shall notify the parent(s), staff and the Office of Early Childhood within five (5) days of changes in these policies, plans and procedures.

Cited March 23, 2022

First Aid Trained Staff [19a-79-4a(e)(2) and/or 19a-79-4a(f)]

Regulation: At all times the child care center or group child care home is in operation, there shall be present at least one (1) staff member who has successfully completed within the past three years an Office of Early Childhood approved first aid course. The child care center or group child care home shall keep on file written verification of compliance with this requirement for each staff member who the child care center or group child care home designates to meet the first aid requirement.

Cited March 23, 2022

Logs/Visits Documented [19a-79-4a(h)(2)(G)]

Regulation: A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that is kept on file at the facility for two years.

Cited March 23, 2022

First Aid Kit(s):Indoor/Outdoor/Field Trip [19a-6a(c) and/or 19a-6a(d)]

Regulation: The facility shall maintain at least one (1) portable, readily available first aid kit wherever children are in care, including field trips, outdoor play areas and one to remain at the facility if all the children do not attend the field trip. Each kit shall be a closed container for storing first aid supplies, accessible to staff at all times but out of the reach of children. The first aid kit shall contain specified items and be restocked after use, and an inventory shall be conducted at least

Cited March 23, 2022

Professional Development [19a-79-4a(a)(3) and/or 19a-79-4a(g)]

Regulation: A file shall be kept on the licensed premises for each employee of the child care center or group child care home which shall include documentation of professional development for each program staff person who cares for the children, including new employee orientation and annual training for current staff on programs policies, plans and procedures. Professional development for program staff shall be required for one (1) per cent of the total annual hours worked. The operator of the child c

Cited March 23, 2022

CPR Certified Staff [19a-79-4a(e)(1) and/or 19a-79-4a(f)]

Regulation: At all times the child care center is in operation there shall be present at least one (1) staff member who has current certification in CPR appropriate for all of the children served at the child care center. The child care center shall keep on file written verification of compliance with this requirement for each staff member who the child care center or group child care home designates to meet the CPR requirement.

Cited March 23, 2022

Administration of Medications: Training Outline/Med Training [19a-79-9a(b)]

Regulation: Upon completion of the required medication administration training program, the training approval and an outline of the curriculum content shall be on file at the facility.

Cited March 23, 2022

Operable CO Detector on Each Level [19a-79-7a(e)(18)]

Regulation: Child care centers and group child care homes that utilize combustible fuel shall be equipped with at least one (1) operable carbon monoxide (CO) detector on each occupied level of the facility.

What parents say

This is a wonderful program that will stay in our memory forever. My son started when he was 3 and it is amazing when he finished as he was 5 how much he has learned. The teachers Care about your child as their own. Toys are always washed the place is so nice and clean. There is so many fun and learning activities. I am sending my daughter this September as well. You won’t find better program and teachers. Thank You.

Mia P · 5/5 on Google · 8 years ago

Amazing program with amazing, caring, nurturing teachers. My daughter loved each and every moment she spent at Park. She is beyond ready to begin kindergarten thanks to them :) I truly wish I could send her to park forever!

Angela Avdevich · 5/5 on Google · 5 years ago

Wonderful program with caring staff. I've had 3 children go through the program and they all were well adjusted and prepared for elementary school.

Kate L · 5/5 on Google · 5 years ago
Read all 4 reviews on Google →

Getting there

283 Broadway, Norwich, CT 06360

Questions about Park Nursery Schools

Is Park Nursery Schools licensed?

Yes. Park Nursery Schools holds an active Child Care Center licence from Connecticut Office of Early Childhood (licence DCCC.12202), with a licensed capacity of 21 children. The state record was synced in September 2026.

Has Park Nursery Schools had any inspection violations?

Connecticut records 13 violations for Park Nursery Schools in the last three years, across 5 inspections on file. The median daycare center in the area has 18. Each one is listed above with the date it was corrected.

What ages does Park Nursery Schools take?

Park Nursery Schools is licensed to serve preschool ages, and is open 8:30 am to 1:30 pm.

How much does Park Nursery Schools cost?

Park Nursery Schools does not publish tuition on its website. Ask for the full fee schedule on a tour, including registration, supply and late pick-up fees.

Similar programs nearby

All Norwich programs →